Consent to build on land liable to flooding

Council Consent is required to construct a building on land that is designated liable to flooding.

Proposed buildings within flood prone areas must be assessed for safety, ensuring the proposed structures do not obstruct natural drainage or water flow and create risk for you or any future occupants.

Regulation 51.2 building information certificates include if your land is within a flood prone area or not. 

Your certificate will also include if your land is subject to termites, within a fire prone area or subject to any developer contribution levies.

The building surveyor you have appointed to issue your building permit will determine if Council consent is required. 

It is not recommended you apply before receiving this determination, as some exemptions do apply even if your land is within a flood prone area.

If you are unsure, please email us at [email protected] before submitting your application.

Complete and sign the relevant application form and prepare the mandatory documents for lodgement. These include;

  • Working drawings
    • Including a site plan, elevations and a clear finished floor level.
  • Title documentation
    • Including a plan of subdivision, title search and any restrictions, covenants or agreements.

Lodge your application by attaching the above documents and emailing it through to [email protected]

Once your application is received, we will issue you with an invoice. All outstanding fees must be paid prior to assessment of your application commencing.

Applications can take up to four weeks to be assessed before you receive a formal decision.

We may take longer than four weeks if:

  • Documentation provided is incomplete or further information and/or clarification is required.
  • Your application needs to be referred to a reporting authority, such as the Corangamite Catchment Management Authority (CCMA).