Civil Infrastructure Standard Drawings

We provide our Civil Infrastructure Standard Drawings to be viewed or downloaded for contractor use.

Please refer to the Infrastructure Design Manual before using these drawings. The City of Greater Geelong has also produced several Design Notes which provide additional information and amended requirements to the IDM Standard Drawings.  It is recommended to read the Design Notes prior to downloading any standard drawings.

All the drawings are published on this site in Adobe PDF format. These files can be opened, viewed and printed by anyone with Adobe Acrobat Reader 5.0 or later.

It will be a contractor's responsibility to obtain and maintain up-to-date copies of the standard drawings.

These Standard Drawings and Design Notes will be updated from time to time as required, without prior notice. It will be the responsibility of interested parties to regularly check this update history and download any revised standard drawings to keep their master copies of these documents current.

We will not be responsible for any loss or penalty incurred by any party who has failed to maintain up to date copies of these documents.

Note:  The Civil Infrastructure (Standard) Drawings that are shaded grey in this table have been superceded and should no longer be used. Using the link will take you to the Infrastructure Design Manual webpage and the current applicable Standard Drawings.

Drawing numberDescription
 Design Notes
 Cover and Index
100Trenching
CGG101Stormwater pipe trench details in road reserve see IDM SD 310
CGG102Stormwater pipe trench details in easements and reserves see IDM sd 310
200Pipes and Earthen Drains
CGG20190mm dia subsurface drain at existing / new kerb and channel see IDM 145
CGG202Fin type subsurface drain at existing / new kerb and channel
CGG203Catch drain details see IDM SD 500
CGG204House drain to kerb and channel see IDM SD 505
CGG205Street drain connection see IDM SD 515
CGG206Easement drain connection see IDM SD 520
300Pits and Drainage Structures
CGG301Pit dimensioning and setting out detail see IDM SD 400
CGG302Unhaunched pits (450 dia max pipe) see IDM SD 405
CGG303Haunched pits see IDM SD 410
CGG304Min wall thickness for reinforcement in mass concrete pits (cast in-situ) see IDM SD415
CGG305Step irons
CGG306Junction pit in road reserve / municipal reserve see IDM SD 420
CGG307Grate pit in road reserve see IDM SD 420
CGG308Junction pit with concrete cover (non trafficable areas) see IDM SD 425
CGG309Side entry pit - 0.9m inlet with cast iron cover and concrete surround for 'B2' see IDM SD 430
CGG310Side entry pit - 0.9m inlet with cast iron cover and concrete surround for ‘SM2' see IDM SD 435
CGG311Side entry pit - 0.9m inlet with cast iron cover and concrete surround for ‘FM4'
CGG312Dual side entry pit 1.9m inlet with cast iron cover and concrete surround for ‘B2' see IDM SD 445
CGG313Dual side entry pit 1.9m inlet with cast iron cover and concrete surround for ‘SM2' see IDM SD 450
CGG314Depressed grated pit see IDM SD 455
CGG315Inlet catch pit see IDM SD 460
CGG316Reinforced concrete wing wall (in-situ) see IDM SD 465
CGG317Concrete endwall see IDM SD 470
CGG318Grated side entry pit - 0.9m inlet with concrete surround for ‘B2' see IDM SD 475
400Kerbs
CGG401‘B1' Barrier kerb only see IDM SD 100
CGG402‘B2' Barrier kerb and channel see IDM SD 100
CGG403‘B3' Barrier kerb and tray see IDM SD 100
CGG404Layback for ‘B2' and ‘B3' Kerbing see IDM SD 120
CGG405‘SM1' Semi-mountable kerb only see IDM SD 100
CGG406‘SM2' Semi-mountable kerb and channel see IDM SD 100
CGG407‘SM3' Semi-mountable kerb and tray see IDM SD 100
CGG409‘FM1' Fully mountable kerb only
CGG410‘FM2' Fully mountable kerb and channel
CGG411‘FM3' Fully mountable kerb and tray
CGG412‘FM4' Fully mountable kerb, channel and side entry pit detail for ‘FM4'
CGG413‘FM5' Fully mountable kerb and channel industrial area
CGG414Concrete edge strip see IDM SD 100
CGG415Open invert drain see IDM SD 100
CGG416Bluestone kerb and concrete channel (major works)
CGG417Bluestone kerb and channel (minor works)
CGG418Reconstructed kerb and channel see IDM SD 145
500Typical Road Cross Sections
CGG501Road hierarchy table
CGG502Residential and industrial road works see IDM SD605
CGG503Rural road works see IDM SD 610
600Pavements
CGG601Vehicle crossing - residential see IDM SD240
CGG602Vehicle crossing - commercial / industrial see IDM SD 250
CGG603Vehicle crossing - rural see IDM SD 255
CGG604Residential footpath treatment at street intersections see IDM SD 200
CGG605Concrete footpath see IDM SD 205
CGG606Footpath expansion joint see IDM SD 210
CGG607Pedestrian crossings in paved areas see IDM SD 200
CGG608Vehicle crossings bluestone kerb and channel
CGG609Pedestrian crossing bluestone kerb and channel
CGG610Reinforced pavement jointing layout
CGG611Reinforced concrete pavement longitudinal joint see IDM SD210 & 215
CGG612Reinforced concrete pavement transverse construction joint see IDM SD 210
CGG613Reinforced concrete pavement transverse contraction joint see IDM SD 225
CGG614Reinforced concrete pavement isolation joint see IDM SD220
CGG615Reinforced concrete pavement sealant details see IDM SD 215
CGG616Reinforced concrete pavement expansion joint see IDM SD  210&215
CGG617Reinforced concrete pavement edge thickening
CGG618Reinforced concrete pavement future construction joint see IDM SD 225
CGG619Reinforced concrete pavement sawn contraction joint see IDM SD 225
700Miscellaneous
CGG702Swing gate entry (Layout)
CGG703Swing gate entry (Detail)
CGG705Timber edge strip landscaped areas
CGG708Timber post and steel rail fence
CGG709Timber post and rail fence
CGG710Sign Post

Disclaimer and Copyright

These standard drawings are the property of City of Greater Geelong, which is a Local Government Authority in Victoria, Australia. It contains information, documents, pages and images prepared by the City of Greater Geelong. While the information contained in this website has been formulated with all due care, the City of Greater Geelong does not warrant or represent that the information is free from errors or omission, or that it is exhaustive. Users of the standard drawings will be responsible for making their own assessment of the information and should verify all relevant representations, statements and information. If you're concerned about any issue raised by the material then you should seek your own professional advice.

The information is made available on the understanding that the City of Greater Geelong and its employees and agents shall have no liability (including but not limited to liability by reason of negligence) to the users for any loss, damage, cost or expense incurred or arising by reason of any person using or relying on the information and whether caused by any error, omission or misrepresentation in the information or otherwise. While the information is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may affect the accuracy of the information. The information may change without notice and the City of Greater Geelong is not in any way liable for the accuracy of any information printed and stored by a user.

The information provided in each of the drawings sets out guidelines for the selection of design standards and practices for construction works.

Should further information be required please contact the Administrative Officer Engineering Services on 03 5272 5272 or refer to the feedback section below.