This manual has been developed as a guide to specifying, installing and maintaining public open space landscaping within the City of Greater Geelong.
The manual:
- sets out landscaping standards which meet the satisfaction of the Responsible Authority for new subdivisions within the City of Greater Geelong.
- is to be used as a reference tool by Council representatives when assessing permit applications, by Consultants for consideration during the preparation of landscape plans for Council submission, and by Landscape Contractors, Site Superintendents and Council Representatives in the field for the purposes of landscape construction, inspections and maintenance.
- is to be used to ensure that the quality and workmanship of works undertaken within the municipality are of a standard that is in accordance with accepted industry standards, and sound horticultural and conservation practices.
In addition to establishing standards, this manual provides Developers, Site Superintendents and their Contractors with the following useful information relating to the construction and maintenance of public open space reserves with the City of Greater Geelong:
- key council contacts
- practical completion and handover inspection procedures and checklists
- maintenance obligations.
The assessment of works against this manual should be undertaken with a degree of flexibility, acknowledging that alternate approaches can be appropriate where they are considered to be to the satisfaction of the Responsible Authority.
All landscape works must be documented and endorsed by Council within the detailed landscape plans forming part of the approved planning permit. This may include the requirement for the following plans to be read and prepared in conjunction with the Landscape Plan;
- Vegetation Management Plan
- Tree Management Plan
- Weed Management Plan
- Native Vegetation Offset Management Plan
- Cultural Heritage Management Plan
- Irrigation Layout and Design
- Construction Management Plan
- Site Management Plan
- Environmental Management Plan
- Litter Control Plan
- Landscape Maintenance Plan
It is the developer’s responsibility to ensure all relevant authorities are notified and requirements are met. These standards do not waive any responsibilities or approvals required by other authorities.
The Landscape Standards Manual is continually reviewed and will be periodically updated to ensure it remains accurate and responsive to changes and improvements in landscaping and asset management practices.
Definitions
| 1 | CoGG | The City of Greater Geelong |
| 2 | Contractor | The company/person contracted to undertake the construction and maintenance of the entire works or part of the works, or their authorised representative. |
| 3 | Council Representative | The Council Officer nominated by the City of Greater Geelong to provide comment and conduct inspections during Construction, Practical Completion, Maintenance and Handover of landscape works. For reserve landscaping this is generally the Recreation and Open Space Planning and Subdivisions Officer. For tree planting in reserves and streetscapes this is generally the Parks Planning Officer. |
| 4 | Handover | The point following the satisfactory completion of the Maintenance Period at which ongoing maintenance responsibility for reserve assets, landscapes and tree plantings is handed over to Council. It is the responsibility of the Site Superintendent to arrange for a Handover Inspection following the conclusion of the Maintenance Period. |
| 5 | Maintenance Bond | Bond to be submitted and held by Council for the duration of the Maintenance Period. The Bond should cover 125% of the cost of reserve inspections and maintenance and tree establishment and maintenance. |
| 6 | Maintenance Period | The period (generally 24 months unless agreed otherwise) following Practical Completion, during which the Site Superintendent is responsible for maintaining all reserve assets, landscaping, and tree plantings in a condition satisfactory to the Responsible Authority. |
| 7 | Outstanding Works Bond | Bond to be submitted for approval where works will not be completed prior to the issuing of a Statement of Compliance. |
| 8 | Practical Completion | When the landscaping and tree planting has been completed in accordance with the Landscape Plan to the satisfaction of the Responsible Authority. Practical Completion approval commences the Maintenance Period and is required prior to the return of any outstanding Works bonds held for landscape construction or tree planting. |
| 9 | Responsible Authority (RA) | The City of Greater Geelong. |
| 10 | Site Super intendent | The Permit Holder or their nominated representative responsible for the construction and maintenance of reserve assets, landscaping and tree planting. |
Key Council contacts
| Department | Issues/Assets | Position/Contact telephone |
|---|---|---|
| Open Space Planning | General Reserve Landscaping Playgrounds Barbecues Garden beds Turf Fencing Reserve Practical Completion/Handover Inspections | Senior Open Space Planner 03 5272 5272 |
| Environment and Natural Resources Unit | Wetlands and Waterways Remnant and Native Vegetation Vegetation Offsets Weed Management | Environmental Planning Team Leader 03 5272 5272 |
| Tree Management | Tree Species Selection Tree Planting Tree Protection/Removal Street and Reserve Tree Inspections Parks | Parks Planning Officers 03 5272 5272 |
| Parks and Support Services | Irrigation Systems
| Irrigation Officer 03 5272 5272 |
| Arts and Culture | Public Art | Public Art Officer 03 5272 5272 |
| Property and Facilities | Structures and Public Toilets Shelters Decks | Co-ordinator Facilities Maintenance 03 5272 5272 |
| Engineering | Civil Works Concrete Paths and Retaining Walls Bridges Boardwalks Lighting | Development Engineer 03 5272 5272 |